Understanding the Building Period
Before commencing construction, homeowners should ensure that the building contracts specifies a building period. A building period is the amount of time allowed for the builder to complete the work. This period will be influenced by various factors, such as the size and complexity of the project, the weather, and any changes to the scope of work. It is important to note that the building period is not a guarantee that the work will be completed within that time frame. In fact, it is not uncommon for projects to run over schedule due to unforeseen circumstances.
When a building period is specified in the contract, it is important to understand the implications of the period. A homeowner should ensure that they have a clear understanding of their rights and obligations, as well as those of the builder, in relation to the building period. Failure to do so can result in disputes between the parties regarding time extensions and associated costs.
Causes of Building Overruns
Building overruns can occur due to a variety of factors, some of which are beyond the control of the homeowner. It is important to identify the cause of the delay to determine the appropriate course of action. Some common causes of building overruns include:
- Poor planning: Inadequate planning and preparation can cause delays in construction. This includes inaccurate estimations of the time required to complete the project, and not taking into account external factors such as weather conditions and delivery delays.
- Unforeseen site conditions: The site conditions may be different from what was initially anticipated, leading to delays in construction. Examples of unforeseen site conditions include the discovery of hazardous materials, soil instability, or underground utility lines.
- Changes in design: Changes in design during the construction process can also cause delays. This may be due to changes requested by the homeowner or due to unforeseen issues that require design changes.
- Contractor performance issues: Delays can also occur due to issues with the contractor’s performance. This includes the contractor not providing enough workers, equipment breakdowns, or failing to adhere to the project schedule.
- Permitting and inspection delays: The process of obtaining permits and scheduling inspections can be time-consuming, and delays in this process can cause the project to overrun.
It is important to identify the cause of the delay to determine the appropriate course of action. If the cause is within the control of the homeowner, they may need to consider adjusting their expectations or providing additional resources to the project. If the cause is outside of their control, they may need to seek assistance from the contractor or other professionals to address the issue.
Steps to Take When Building Work is Overrunning
If you are a homeowner and you find that your building work is overrunning, it can be a frustrating and stressful experience. However, there are steps that you can take to address the issue and ensure that your project is completed to your satisfaction.
- Communicate with your builder: The first step is to communicate with your builder and express your concerns about the overrun. You should ask your builder for an explanation of why the project is behind schedule, and if there is a plan to get the project back on track. Be sure to document all communications with your builder in writing.
- Check your contract: Review your building contract to understand what remedies are available to you in the event of a delay. Many contracts will provide for liquidated damages, which are predetermined amounts that the builder will owe you for each day that the project is delayed.
- Seek legal advice: If you are unsure of your rights and remedies under your building contract, it may be wise to seek legal advice from a construction lawyer. A construction lawyer can advise you on your legal options and negotiate on your behalf with your builder.
- Consider mediation: If the dispute cannot be resolved through communication with your builder or through legal means, you may consider mediation. Mediation is a process where a neutral third party works with both you and your builder to help find a resolution to the dispute.
- Document everything: Throughout the process, it is essential to document everything. Keep a record of all communications with your builder, including emails, phone calls, and in-person meetings. Document the delays and any additional costs incurred as a result of the overrun.
- Keep a cool head: Finally, it is crucial to remain calm and level-headed throughout the process. Building work can be stressful, but losing your temper or getting emotional will not help resolve the situation. Stick to the facts and maintain a professional demeanor.
By following these steps, you can take control of the situation and ensure that your building work is completed to your satisfaction. Remember that communication is key, and seeking legal advice may be necessary to protect your rights as a homeowner.
Communicate with the Builder
In order to resolve building overruns, it is important for the homeowner to communicate with the builder. This involves discussing the issues and concerns regarding the delay in completion and finding ways to address them. Homeowners should clearly express their expectations and discuss the implications of any delay. The builder should be made aware of the need to complete the work in a timely manner while also ensuring that the work is done to the required standard. Effective communication can help to identify any issues and find solutions before they become bigger problems. Homeowners should be proactive in asking for regular updates on the progress of the work and raising any concerns they have as soon as possible. This will help to ensure that the building work stays on track and is completed within the agreed time frame.
Check the Contract
Before taking any action, it’s important to review the building contract to understand the agreed-upon terms and conditions regarding the building period. Check if there are provisions in the contract that allow for extensions of time or if there are penalties for the builder if the building period is exceeded. Additionally, look for any provisions that require the builder to notify the homeowner if there will be a delay in completing the work. Understanding the contract is crucial when dealing with building overruns, as it sets out the rights and obligations of both parties. If there are any uncertainties or ambiguities in the contract, seek legal advice from a solicitor experienced in construction law.
Seek Legal Advice
If the above steps do not resolve the issue, it may be necessary to seek legal advice. A construction lawyer can help you understand your legal rights and obligations, as well as advise you on the best course of action to take.
A lawyer can review your contract to see if the builder has breached any terms or if there are any provisions that can be used to enforce the building period. They can also assist in negotiating with the builder and resolving disputes.
It is important to seek legal advice as soon as possible, as there may be time limits for taking action. The longer you wait, the harder it may be to enforce your legal rights and seek a remedy.
Keep in mind that a lawyer’s fees can be expensive, but in the long run, it may be worth it to protect your investment and ensure that the building work is completed within the agreed-upon timeframe.
Options Available to Homeowners
When a building work is overrunning, homeowners have several options available to them. These options include:
- Negotiating a new timeline: Homeowners can negotiate a new timeline with their builder to complete the work. This can be done either informally or formally, with the help of a mediator or lawyer.
- Termination of the contract: If the builder is unable to complete the work within the agreed timeline, the homeowner can terminate the contract. This option should only be exercised after seeking legal advice and making sure that the builder has breached the contract.
- Compensation for losses: If the builder is responsible for the delay, the homeowner may be entitled to compensation for any losses they have incurred as a result of the delay. This can include costs associated with living elsewhere while the work is completed or financial losses incurred as a result of the delay.
- Claiming damages: Homeowners can also claim damages from the builder for breach of contract. This would involve making a claim for compensation for any losses incurred as a result of the builder’s breach of contract.
It is important for homeowners to seek legal advice before pursuing any of these options to ensure that they understand their rights and obligations under the contract.
Get Expert Construction Contract Review and Advice
Get Your HIA Contract Reviewed Now
Step 1: Simply fill out this form and upload your contract.
Step 2: We’ll review it and return to you with a fixed fee quote.
Minimise construction risks on cost, time, and quality.
Get Home Building Contract Review and Advice now.
Conclusion
In conclusion, dealing with building overruns can be a challenging and stressful experience for homeowners. However, it is important to remember that there are several steps that can be taken to resolve the situation. By communicating with the builder, checking the contract, seeking legal advice, and exploring options such as filing a complaint with Fair Trading or a claim with NCAT, homeowners can take control of the situation and protect their legal rights. If you are experiencing building overruns, it is important to seek legal advice from a solicitor or construction lawyer with experience in construction law. As an experienced construction lawyer, I am available to provide legal advice and represent homeowners and builders in NSW and other Australian states, ensuring that their contractual and legal rights are protected.