![](https://www.contractsspecialist.com.au/wp-content/uploads/2024/03/What-are-the-key-features-of-abic-contracts-that-make-them-suitable-for-architectural-projects_-Featured-Image-300x164.jpg)
What Are the Key Features of ABIC Contracts That Make Them Suitable for Architectural Projects?
ABIC (Australian Building Industry Contracts) are specifically designed to cater to the needs of architectural projects, offering a range of features that make them particularly suitable for such endeavours. The key features of ABIC contracts that contribute to their suitability for architectural projects include: