1. Risk Allocation
Both MW and SW contracts aim to provide a fair and equitable allocation of risks between the parties involved. They are structured to clearly define the responsibilities and liabilities of each party, thereby minimising potential disputes related to risk management.
2. Payment Terms
The contracts outline clear payment terms, ensuring that the process of invoicing, payment schedules, and mechanisms for dealing with payment disputes are transparent and agreed upon by both parties from the outset. This clarity helps in maintaining a smooth financial relationship between the client and the contractor.
3. Variation Terms
Both contracts include provisions for dealing with variations to the works. They set out the procedures for requesting, approving, and executing changes to the original scope of work, ensuring that any necessary adjustments can be made efficiently and with mutual agreement.
4. Compliance with Contract Procedures
MW and SW contracts are designed to be user-friendly, with clear instructions and procedures that guide the parties through the contract administration process. This includes steps for dealing with common issues such as delays, defects, and variations, making it easier for both parties to comply with the contract requirements.
These similarities ensure that both ABIC Major Works and Simple Works contracts provide a solid foundation for project management and administration, facilitating clear communication, fair risk distribution, and effective handling of variations and payments, regardless of the project’s size or complexity.
5. Integrated Project Delivery (IPD) Contract
A collaborative agreement that includes the owner, architect, and contractor, spreading the risk and rewards based on the project’s financial results. It aims to foster innovation and teamwork.
6. Construction Contracts
Including lump sum, time and materials, unit price, guaranteed maximum price, and cost-plus contracts. Each type is suitable for different project needs and risks, offering various advantages and disadvantages.
![](https://www.contractsspecialist.com.au/wp-content/uploads/2024/03/What-are-the-similarities-between-the-abic-major-works-and-simple-works-contracts_-Featured-Image.jpg)
These contracts cater to different aspects of architectural and construction projects, from the initial design phase to the actual construction, and vary in terms of complexity, legal protection, and the specificity of terms and conditions.